On Monday morning, we began preparations for the loading process. We placed the injection molding machine and the robot on the company premises and took the necessary safety precautions.
In the afternoon, the mobile crane arrived and began loading the machine. The robot was loaded first, followed by the injection molding machine.
The loading process went smoothly and was completed on the same day. The truck with the machine and the robot was then taken to the port, where it was loaded onto a ship.
The machine and the robot will be transported by ship to Asia in the coming days.
We hope that the transport goes smoothly and that the machine and the robot arrive safely at their destination.